Tender Evaluation
Evaluate tenders with full transparency
Rank tenders on price, compliance, capability, and track record, with every step documented.
Free with an account. Runs in your browser.
Criteria it starts with
- Price
- Compliance
- Capability
- Track Record
What tender evaluation involves.
Tender evaluation is the assessment of bids received in a formal tender, often in public or regulated procurement where the process itself must be fair, documented and open to challenge. The evaluation has to apply criteria that were set in advance, treat every bidder in the same way and leave a record that explains the outcome.
Many tenders combine a price element with quality elements such as compliance, technical capability and past performance. How those elements are weighed changes the result: a tender won on lowest price alone and one won on the most economically advantageous combination of price and quality can have different winners from the same bids.
CKR helps with the combination step. The criteria and their importance are set first, every bid is scored on the same 1 to 10 scale, and 25 ranking methods produce a ranking with a measure of agreement. The report records every input, and on the Team plan each evaluator scores independently with conflicts of interest declared.
How to score each criterion.
Every criterion is scored from 1 to 10 for every tender, and 10 always means the best position on that criterion. Give 10 to the best tender on a criterion and score the others by how far they fall behind. Set how important each criterion is, also from 1 to 10, before you start scoring.
- Price
- Score the bid price, with 10 for the most favourable, on the basis the tender documents specify (for example whole-life cost or price for the defined quantities).
- Compliance
- Score how completely the bid meets the mandatory and stated requirements. Bids that fail a mandatory requirement are usually excluded before scoring, according to your tender rules.
- Capability
- Score the bidder’s technical and organisational ability to deliver: resources, method statement, equipment and key personnel.
- Track Record
- Score relevant past performance: comparable contracts, references, and documented delivery on previous work.
Criteria people often add
- Health and safety
- For works and on-site services.
- Quality management
- Certification and the approach to quality control.
- Delivery programme
- The credibility of the proposed schedule.
- Sustainability
- Where the tender includes environmental or social criteria.
See it on an example.
Four tenders scored on the preset criteria. The ranking below is what CKR computes from these scores.
- Every method, one answer
- Each ranking method has its own logic; CKR runs them all and reports the mean rank, so the result does not hang on one method’s assumptions.
- How much they agree
- Kendall’s W says how far the method runs agree, from 0 (no agreement) to 1 (identical rankings).
- Your scores, your weights
- Your importance ratings set your own weighting; the example rates every criterion equally.
| Price | Compliance | Capability | Track Record | |
|---|---|---|---|---|
| Tender A | 7 | 8 | 6 | 7 |
| Tender B | 9 | 6 | 7 | 5 |
| Tender C | 6 | 9 | 8 | 8 |
| Tender D | 8 | 7 | 5 | 9 |
Final ranking
- 1Tender Cmean rank 1.03
- 2Tender Dmean rank 2.08
- 3Tender Amean rank 3.03
- 4Tender Bmean rank 3.86
Agreement across the method runs: W = 0.89, strong.
How the ranking is calculated.
Your scores form a decision matrix: one row per tender, one column per criterion. CKR turns that matrix into a ranking in three steps.
Weights. Your importance ratings, divided by their total, are one weighting of the criteria. CKR also derives up to ten objective weightings from the scores themselves, with methods such as CRITIC, Entropy and MEREC, most of which give more weight to criteria on which the tenders differ more. That makes up to 11 weight sets (a method that cannot work with a particular set of scores is left out).
Ranking methods. Each of 25 ranking methods, including TOPSIS, VIKOR, PROMETHEE, Simple Additive Weighting and the Weighted Product Model, ranks the tenders under each weight set. The methods differ in how they treat trade-offs: some reward a tender that is good on every criterion, others one that is outstanding on a few.
Combined result. The final ranking orders the tenders by their mean rank over all runs. Alongside it, CKR reports how often each tender took each place and Kendall’s W, a measure of how far the runs agree. A high W with a clear first place means the result does not depend on the choice of method; a low W, or two tenders sharing first place across runs, means the decision rests on a judgement worth discussing.
Every method CKR runs is checked against a published example or an independent implementation, and each has its own page with the steps, formulas and original reference under Methods.
Common mistakes.
- Criteria or weights that differ from the tender documents
- The evaluation must apply what was published. Copy the criteria and weights from the documents into CKR exactly, before opening the bids.
- Scoring a criterion that was not advertised
- An unadvertised criterion, however sensible, is a common ground for challenge. Note it as an observation instead of scoring it.
- Unrecorded clarifications
- If a bidder was asked to clarify, record the question and answer and score on the clarified bid.
- One evaluator’s view standing for the panel
- Independent scoring by several evaluators, combined by a stated method, is easier to defend than a single score sheet.
An example
Evaluating bids for a maintenance contract.
An illustrative situation, not a real client.
A municipal body tenders a three-year building maintenance contract. The tender documents state four criteria with relative importance: Price, Compliance, Capability and Track Record. Six bids arrive; one fails a mandatory insurance requirement and is excluded.
Three evaluators score the remaining five bids independently on the Team plan. One evaluator declares a conflict with a bidder and does not score that bid; the declaration is recorded with the round.
After reveal, the combined ranking and the evaluators’ agreement are shown, with the criteria where they differed most. The chair signs off the version, which is then locked, and the report records who signed off and when.
How it works.
- 01
Define
Name the tenders and the criteria, starting from the preset ones, and rate how much each criterion matters.
- 02
Score
Give each of the tenders a score from 1 to 10 on every criterion, 10 being best, or paste the block from a spreadsheet.
- 03
Rank
25 ranking methods run under up to 11 weight sets; the ranking shows how strongly they agree (Kendall’s W) and which of the tenders came first most often.
Free: every method and the ranking on screen, with up to 6 tenders and 6 criteria. Pro adds the PDF report, larger evaluations and projects saved to your account. Deciding as a committee? Team (3 to 10 people) lets each evaluator score on their own and combines the scores.
Questions.
Does CKR decide which bid wins?
No. CKR combines the scores and weights you enter and shows the resulting ranking, how much the methods agree and where evaluators differ. The award decision, and compliance with your procurement rules, remain with your organisation.
Can I use CKR for public procurement?
CKR can be used to record and combine the scores in any tender. Whether its outputs meet the requirements of a particular procurement regime is for your organisation to confirm; the report shows every criterion, weight and score so that it can be checked.
How are scores from several evaluators combined?
On the Team plan the round states its method: the arithmetic or the geometric mean of the evaluators’ scores. The method and its reference are shown wherever the results appear, together with the spread of scores for each bid and criterion.
What happens if an evaluator has a conflict of interest?
On the Team plan, each evaluator declares, for every bid, whether they have a conflict before they can score. A declared conflict means they do not score that bid, and the declaration is recorded with the round and shown in the report.
Can a signed-off evaluation be changed?
No. A signed-off version is read-only and the sign-off cannot be withdrawn. Changes are made in a new version that points back to the signed one, so the record of what was approved stays intact.
Is it free?
Yes, with an account. The Free plan runs every ranking method and shows the full ranking on screen, for up to 6 options and 6 criteria, and keeps your current project in your browser. Pro adds the PDF report, larger evaluations, import from spreadsheets and projects saved to your account.
Where is my data processed?
The ranking is calculated in your browser. On the Free plan the current project stays in that browser; on Pro and Team, projects you save are stored on your account so that you can open them on any device.
Related decisions.
- RFP ScoringEvaluate RFP responses on technical, financial, timeline, and risk factors with scientific rigor.
- Supplier EvaluationCompare suppliers on price, quality, delivery, and reliability, and see how far 25 ranking methods agree on the order.
- Contract EvaluationCompare contracts on pricing, SLAs, liability, and flexibility. Data-driven selection across all terms.