Supplier Evaluation
Evaluate suppliers on every criterion that matters
Compare suppliers on price, quality, delivery, and reliability, and see how far 25 ranking methods agree on the order.
Free with an account. Runs in your browser.
Criteria it starts with
- Price
- Quality
- Delivery Time
- Reliability
What supplier evaluation involves.
Supplier evaluation is the comparison of companies that could supply a material, component or service, before an order or a framework agreement is placed. The cheapest quotation is easy to find; the difficulty is that price is rarely the only thing that matters. A supplier that is five per cent cheaper but delivers late one order in four can cost more in stoppages, expediting and safety stock than it saves.
A multi-criteria evaluation makes those trade-offs explicit. You decide in advance which criteria count and how much, score every supplier on the same scale, and let a calculation combine the scores. The result is a ranking that can be explained to a manager, an auditor or a supplier who asks why they were not chosen, because every input is written down.
The method used to combine the scores also matters. Different ranking methods reward different profiles: some favour a supplier that is good on everything, others one that is excellent on the most important criterion. CKR runs 25 ranking methods and reports where they agree, so you can see whether the first place is robust or depends on one method’s assumptions.
How to score each criterion.
Every criterion is scored from 1 to 10 for every supplier, and 10 always means the best position on that criterion. Give 10 to the best supplier on a criterion and score the others by how far they fall behind. Set how important each criterion is, also from 1 to 10, before you start scoring.
- Price
- Score the commercial offer, with 10 for the lowest total cost. Compare like with like: unit price plus freight, duties, payment terms and any minimum order quantity, not the headline unit price alone.
- Quality
- Score conformance to specification: incoming inspection results, defect or rejection rates, certifications held and the outcome of any audit or sample test. 10 is the supplier you would expect the fewest quality problems from.
- Delivery Time
- Score the lead time and how much you trust it, with 10 for the shortest dependable lead time. A quoted two weeks that is usually four should score below a quoted three weeks that is always three.
- Reliability
- Score the supplier as a business: financial stability, capacity headroom, dependence on a single site or sub-supplier, and how they behaved when something went wrong in the past.
Criteria people often add
- Payment terms
- When working capital is tight, 60-day terms can be worth more than a small price difference.
- Location and logistics risk
- Distance, border crossings and port congestion affect both lead time and its variability.
- Sustainability and compliance
- Environmental, labour and anti-bribery practices, where your customers or policies require them.
- Technical support
- For engineered parts, the supplier’s ability to help with design changes and failures.
See it on an example.
Four suppliers scored on the preset criteria. The ranking below is what CKR computes from these scores.
- Every method, one answer
- Each ranking method has its own logic; CKR runs them all and reports the mean rank, so the result does not hang on one method’s assumptions.
- How much they agree
- Kendall’s W says how far the method runs agree, from 0 (no agreement) to 1 (identical rankings).
- Your scores, your weights
- Your importance ratings set your own weighting; the example rates every criterion equally.
| Price | Quality | Delivery Time | Reliability | |
|---|---|---|---|---|
| Supplier A | 7 | 8 | 6 | 7 |
| Supplier B | 9 | 6 | 7 | 5 |
| Supplier C | 6 | 9 | 8 | 8 |
| Supplier D | 8 | 7 | 5 | 9 |
Final ranking
- 1Supplier Cmean rank 1.03
- 2Supplier Dmean rank 2.08
- 3Supplier Amean rank 3.03
- 4Supplier Bmean rank 3.86
Agreement across the method runs: W = 0.89, strong.
How the ranking is calculated.
Your scores form a decision matrix: one row per supplier, one column per criterion. CKR turns that matrix into a ranking in three steps.
Weights. Your importance ratings, divided by their total, are one weighting of the criteria. CKR also derives up to ten objective weightings from the scores themselves, with methods such as CRITIC, Entropy and MEREC, most of which give more weight to criteria on which the suppliers differ more. That makes up to 11 weight sets (a method that cannot work with a particular set of scores is left out).
Ranking methods. Each of 25 ranking methods, including TOPSIS, VIKOR, PROMETHEE, Simple Additive Weighting and the Weighted Product Model, ranks the suppliers under each weight set. The methods differ in how they treat trade-offs: some reward a supplier that is good on every criterion, others one that is outstanding on a few.
Combined result. The final ranking orders the suppliers by their mean rank over all runs. Alongside it, CKR reports how often each supplier took each place and Kendall’s W, a measure of how far the runs agree. A high W with a clear first place means the result does not depend on the choice of method; a low W, or two suppliers sharing first place across runs, means the decision rests on a judgement worth discussing.
Every method CKR runs is checked against a published example or an independent implementation, and each has its own page with the steps, formulas and original reference under Methods.
Common mistakes.
- Scoring price on a different basis per supplier
- Convert every offer to the same delivered cost per unit before scoring. Otherwise the price scores compare incomparable numbers.
- Letting one criterion hide inside another
- If “Reliability” already includes delivery performance, scoring “Delivery Time” as well counts it twice. Write one sentence per criterion on what it covers.
- Setting weights after seeing the scores
- Decide the importance of each criterion before scoring. Weights chosen afterwards tend to move toward the supplier someone already prefers.
- Using only the extremes of the scale
- If every score is 1 or 10 the comparison loses information. Reserve 10 for the best supplier on that criterion and spread the others by how far behind they are.
An example
Choosing a packaging supplier.
An illustrative situation, not a real client.
A food manufacturer needs a second supplier of printed cartons. Four suppliers quote. Supplier A is cheapest; Supplier C has the best quality record from a trial run; Supplier D is the largest and most stable; Supplier B is local with the shortest lead time.
The buyer sets importance before scoring: Quality 9 (a misprint means a product recall), Reliability 7, Delivery Time 6, Price 5. They score each supplier from 1 to 10 on each criterion, using the trial results and the quotations.
CKR ranks the four under 25 methods and 11 weight sets. If Supplier C comes first in most runs and Kendall’s W is high, the recommendation is well supported. If C and D swap places depending on the method, that is worth saying in the recommendation, together with which criterion separates them.
How it works.
- 01
Define
Name the suppliers and the criteria, starting from the preset ones, and rate how much each criterion matters.
- 02
Score
Give each of the suppliers a score from 1 to 10 on every criterion, 10 being best, or paste the block from a spreadsheet.
- 03
Rank
25 ranking methods run under up to 11 weight sets; the ranking shows how strongly they agree (Kendall’s W) and which of the suppliers came first most often.
Free: every method and the ranking on screen, with up to 6 suppliers and 6 criteria. Pro adds the PDF report, larger evaluations and projects saved to your account. Deciding as a committee? Team (3 to 10 people) lets each evaluator score on their own and combines the scores.
Questions.
How many suppliers should I compare?
There is no fixed minimum, but three to eight is typical. With two suppliers a ranking adds little beyond a side-by-side comparison; with many more, it is usually better to shortlist first on must-have requirements and then rank the shortlist. The Free plan ranks up to 6 suppliers on up to 6 criteria; Pro has no such limit.
Should price be a criterion or a constraint?
If there is a budget ceiling, treat it as a constraint: exclude suppliers above it before scoring. Within the acceptable range, price is a criterion like the others, and its importance says how much a lower price should count against quality or delivery.
Does a 10 for price mean the highest price?
No. In CKR a score always says how good a supplier is on a criterion, so 10 is the best position: the lowest total cost, the shortest dependable lead time, the highest quality.
Why does CKR use 25 methods instead of one?
Each ranking method combines scores differently, and on close decisions they can disagree. Running many and reporting the mean rank, the share of runs in which each supplier came first and their agreement (Kendall’s W) shows whether the recommendation depends on the choice of method.
Can several people score the suppliers?
Yes, on the Team plan. Each evaluator scores on their own, declares any conflict of interest, and nobody sees another evaluator’s scores until the round is revealed. The scores are then combined and the spread between evaluators is shown.
Is it free?
Yes, with an account. The Free plan runs every ranking method and shows the full ranking on screen, for up to 6 options and 6 criteria, and keeps your current project in your browser. Pro adds the PDF report, larger evaluations, import from spreadsheets and projects saved to your account.
Where is my data processed?
The ranking is calculated in your browser. On the Free plan the current project stays in that browser; on Pro and Team, projects you save are stored on your account so that you can open them on any device.
Related decisions.
- Vendor SelectionCompare vendors on cost, capability, experience, and support, with every trade-off stated and checkable.
- Tender EvaluationRank tenders on price, compliance, capability, and track record, with every step documented.
- Vendor PerformanceCompare vendor performance on delivery, defects, cost, and responsiveness.