Risk Assessment
Prioritize risks on more than a heat map
Prioritize risks by impact, likelihood, detectability, and mitigation cost. Focus resources where they matter.
Free with an account. Runs in your browser.
Criteria it starts with
- Impact
- Likelihood
- Detectability
- Mitigation Cost
What risk assessment involves.
Risk assessment orders risks so that attention and budget go first to the ones that matter most. The common tool is a risk matrix of impact against likelihood, which groups risks into a few coloured cells but cannot order the risks within a cell, and ignores factors such as how early a risk would be detected or how much it costs to reduce.
A multi-criteria ranking uses more than two dimensions and produces a full order. Each risk is scored on the same criteria, the criteria are weighted, and the ranking methods combine the scores.
In CKR, scores always describe how favourable a position is, with 10 the best. For risks, that means 10 for the smallest impact, the lowest likelihood, the easiest detection and the cheapest mitigation. The risk tool then reads the ranking from the bottom and presents it as a priority order: priority 1 is the risk with the least favourable scores, the one to treat first.
How to score each criterion.
Every criterion is scored from 1 to 10 for every risk, and 10 always means the best position on that criterion: for a risk, the smallest, least likely, easiest to detect or cheapest to mitigate. Give 10 to the best risk on a criterion and score the others by how far they fall behind. Set how important each criterion is, also from 1 to 10, before you start scoring.
- Impact
- Score the consequence if the risk occurs, with 10 for the smallest impact and 1 for the most severe: financial loss, harm to people, disruption, damage to reputation.
- Likelihood
- Score how probable the risk is over the period you are considering, with 10 for the least likely.
- Detectability
- Score how early the risk would be noticed before it causes harm, with 10 for the easiest to detect in time.
- Mitigation Cost
- Score the cost of reducing the risk, with 10 for the cheapest to mitigate.
Criteria people often add
- Velocity
- How quickly the impact would be felt once the risk occurs.
- Control effectiveness
- How well existing controls already reduce the risk.
- Regulatory exposure
- Whether the risk would also lead to a regulatory consequence.
- Recovery time
- How long it would take to return to normal.
See it on an example.
Four risks scored on the preset criteria. The ranking below is what CKR computes from these scores. For risks, the result is a priority order: priority 1 is the one to treat first.
- Every method, one answer
- Each ranking method has its own logic; CKR runs them all and reports the mean rank, so the result does not hang on one method’s assumptions.
- How much they agree
- Kendall’s W says how far the method runs agree, from 0 (no agreement) to 1 (identical rankings).
- Your scores, your weights
- Your importance ratings set your own weighting; the example rates every criterion equally.
| Impact | Likelihood | Detectability | Mitigation Cost | |
|---|---|---|---|---|
| Risk A | 7 | 8 | 6 | 7 |
| Risk B | 9 | 6 | 7 | 5 |
| Risk C | 6 | 9 | 8 | 8 |
| Risk D | 8 | 7 | 5 | 9 |
Priority
- 1Risk B · treat firstmean rank 3.86
- 2Risk Amean rank 3.03
- 3Risk Dmean rank 2.08
- 4Risk Cmean rank 1.03
Agreement across the method runs: W = 0.89, strong.
How the ranking is calculated.
Your scores form a decision matrix: one row per risk, one column per criterion. CKR turns that matrix into a ranking in three steps.
Weights. Your importance ratings, divided by their total, are one weighting of the criteria. CKR also derives up to ten objective weightings from the scores themselves, with methods such as CRITIC, Entropy and MEREC, most of which give more weight to criteria on which the risks differ more. That makes up to 11 weight sets (a method that cannot work with a particular set of scores is left out).
Ranking methods. Each of 25 ranking methods, including TOPSIS, VIKOR, PROMETHEE, Simple Additive Weighting and the Weighted Product Model, ranks the risks under each weight set. The methods differ in how they treat trade-offs: some reward a risk that is good on every criterion, others one that is outstanding on a few.
Combined result. The final ranking orders the risks by their mean rank over all runs. Alongside it, CKR reports how often each risk took each place and Kendall’s W, a measure of how far the runs agree. A high W with a clear first place means the result does not depend on the choice of method; a low W, or two risks sharing first place across runs, means the decision rests on a judgement worth discussing.
Every method CKR runs is checked against a published example or an independent implementation, and each has its own page with the steps, formulas and original reference under Methods.
Common mistakes.
- Scoring severity instead of position
- A score of 10 means the most favourable position, not the most severe risk. Give 10 to the smallest impact and the lowest likelihood; the priority order then puts the most serious risks first.
- Scoring likelihood without a period
- Likely within a month and likely within ten years are different judgements. State the period and use it for every risk.
- Assessing risks alone
- Different people see different risks. Ask several people to score independently, then compare.
- A register that is never revisited
- Risks change as controls are added and circumstances shift. Re-score on a regular cycle.
An example
Ordering operational risks for a warehouse.
An illustrative situation, not a real client.
A warehouse manager lists six risks: a fire, a key forklift failure, a cyber attack on the warehouse system, a major customer leaving, a labour shortage at peak and a flood.
Each is scored on the four preset criteria with 10 the most favourable, and importance is set as Impact 9, Likelihood 8, Detectability 5, Mitigation Cost 4.
The result lists the risks in order of priority. Suppose the cyber attack and the peak labour shortage come out as priorities 1 and 2: those are the first candidates for action, and the report lists the full order, the scores and the weights for the risk committee.
How it works.
- 01
Define
Name the risks and the criteria, starting from the preset ones, and rate how much each criterion matters.
- 02
Score
Give each of the risks a score from 1 to 10 on every criterion, 10 being best, or paste the block from a spreadsheet.
- 03
Rank
25 ranking methods run under up to 11 weight sets; the ranking shows how strongly they agree (Kendall’s W) and which of the risks came first most often.
Free: every method and the ranking on screen, with up to 6 risks and 6 criteria. Pro adds the PDF report, larger evaluations and projects saved to your account. Deciding as a committee? Team (3 to 10 people) lets each evaluator score on their own and combines the scores.
Questions.
Why does a high score mean a less serious risk?
CKR scores every criterion so that 10 is the most favourable position, the same rule as in every other tool. For a risk that means small, unlikely, easy to detect and cheap to mitigate. The risk tool turns the ranking into a priority order, so priority 1 is the risk with the least favourable scores, the one to treat first.
How is this different from a risk matrix?
A matrix places risks in a few cells on two dimensions. A multi-criteria ranking uses as many criteria as you need, weights them, and gives every risk its own place in the order.
Can I use probabilities and monetary impacts directly?
Convert them to the 1 to 10 scale first, with 10 the most favourable: the lowest probability or smallest loss scores 10. On Pro, importing from a spreadsheet can rescale values for you.
Does CKR replace a risk register?
No. CKR orders the risks you enter on the criteria you set. Owners, actions and review dates belong in your risk register; the ranking and its report can support it.
Is it free?
Yes, with an account. The Free plan runs every ranking method and shows the full ranking on screen, for up to 6 options and 6 criteria, and keeps your current project in your browser. Pro adds the PDF report, larger evaluations, import from spreadsheets and projects saved to your account.
Where is my data processed?
The ranking is calculated in your browser. On the Free plan the current project stays in that browser; on Pro and Team, projects you save are stored on your account so that you can open them on any device.