How to do ISM and MICMAC step by step: SSIM, reachability matrix and level partitions
ISM and MICMAC step by step: SSIM codes, initial and final reachability matrices, level partitions, driving power and dependence, with a worked example.
CKR team · · 9 min read
Interpretive Structural Modelling (ISM) builds a hierarchy of factors from yes/no judgements about which factor leads to which. Experts code every pair as V, A, X or O in a structural self-interaction matrix (SSIM); this becomes a binary reachability matrix, transitivity adds the indirect links, and level partitioning places each factor at the level where its reachability set equals the intersection of its reachability and antecedent sets. MICMAC then classifies each factor as autonomous, dependent, linkage or independent from its driving power (row sum) and dependence (column sum).
The short version
- 01Code each pair once in the SSIM: V (i leads to j), A (j leads to i), X (both) or O (neither).
- 02The final reachability matrix adds every link implied by transitivity; mark those entries 1* so readers can see which links the experts gave and which follow from them.
- 03An element belongs to the current level when its reachability set equals the intersection of its reachability and antecedent sets; remove it and repeat.
- 04In the example, Policy sits at the base (level V) with driving power 7, and Adoption at the top (level I) with dependence 7.
- 05MICMAC splits the factors at n/2 on both axes: high driving power and low dependence makes a factor independent, a key driver worth acting on first.
What are ISM and MICMAC used for?
Interpretive Structural Modelling (ISM) was introduced by Warfield (1974) to turn a set of experts’ opinions about how factors relate into a clear hierarchical structure. It answers a question that weighting and ranking methods do not: in what order do the factors act on each other? The result is a diagram with levels, the factors at the bottom driving the ones above them. In management and engineering research ISM is widely used to study barriers, enablers and success factors, often alongside MICMAC.
MICMAC, the cross-impact matrix multiplication applied to classification, comes from Duperrin and Godet (1973). Applied to the ISM reachability matrix, it places each factor on a chart of driving power against dependence and sorts it into one of four groups. The two together tell a reader which factors are the roots of a problem and which are its outcomes. Mandal and Deshmukh (1994) gave the form of the procedure that most later papers follow, and this tutorial uses it.
- 01Identify the factorsFrom the literature and experts; ISM works best with roughly 7 to 20 factors.
- 02Structural self-interaction matrix (SSIM)Code each pair i < j as V, A, X or O.
- 03Initial reachability matrixConvert the codes into 1s and 0s, with 1 on the diagonal.
- 04Final reachability matrixAdd every link implied by transitivity, marked 1*.
- 05Level partitions and digraphPeel off the top level repeatedly; draw the hierarchy.
- 06MICMACDriving power and dependence from the final matrix; four classes.
Step 1: how do you fill in the SSIM?
The example studies seven enablers of digital transformation in small manufacturing firms: government Policy support, top Management commitment, access to Finance, a skilled workforce (Skills), IT Infrastructure, data Security and digital Adoption itself. For each pair, a panel of experts decided whether one enabler leads to the other. Four codes are used, always read from the row factor i to the column factor j:
- V: i leads to j (Policy leads to Management commitment).
- A: j leads to i.
- X: i and j lead to each other (Infrastructure and Security each require the other).
- O: i and j are unrelated.
| Factor | Adoption | Security | Infrastructure | Skills | Finance | Management |
|---|---|---|---|---|---|---|
| Policy | O | V | O | V | V | V |
| Management | V | O | V | V | V | |
| Finance | O | O | V | O | ||
| Skills | V | V | O | |||
| Infrastructure | V | X | ||||
| Security | V |
Note. Columns run from Adoption back to Management, as is conventional in ISM papers, so each row ends at the diagonal. Each pair is coded once.
Notice that Policy → Adoption is coded O. The experts did not think policy drives adoption directly; any effect runs through management, finance and the other enablers. ISM will add that indirect link in Step 3, and keeping direct and indirect links apart is one of the method’s strengths.
How do you collect the codes from experts?
Experts find the letters V, A, X and O hard to use directly. It is easier to ask two plain questions about each pair, “Does weak access to finance lead to poor IT infrastructure?” and “Does poor IT infrastructure lead to weak access to finance?”, each answered yes or no, and to derive the code afterwards: yes and no gives V, no and yes gives A, two yeses give X and two noes give O. This doubles the number of questions but removes most coding errors.
With several experts, the usual rule is to take the code given by the majority for each pair. Where the panel is split evenly, the safest course is to return the pair to the experts for discussion rather than to break the tie arbitrarily. Keep a record of the disputed pairs; reviewers sometimes ask for them, and they are useful material for the discussion section.
Step 2: how do you build the initial reachability matrix?
Replace each code with two binary entries, one for each direction: V sets (i, j) = 1 and (j, i) = 0; A sets (i, j) = 0 and (j, i) = 1; X sets both to 1; O sets both to 0. Every factor reaches itself, so the diagonal is 1.
| Factor | Policy | Management | Finance | Skills | Infrastructure | Security | Adoption |
|---|---|---|---|---|---|---|---|
| Policy | 1 | 1 | 1 | 1 | 0 | 1 | 0 |
| Management | 0 | 1 | 1 | 1 | 1 | 0 | 1 |
| Finance | 0 | 0 | 1 | 0 | 1 | 0 | 0 |
| Skills | 0 | 0 | 0 | 1 | 0 | 1 | 1 |
| Infrastructure | 0 | 0 | 0 | 0 | 1 | 1 | 1 |
| Security | 0 | 0 | 0 | 0 | 1 | 1 | 1 |
| Adoption | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
Step 3: how do you add transitivity?
ISM assumes that influence is transitive: if Policy leads to Finance and Finance leads to Infrastructure, then Policy leads to Infrastructure. The final reachability matrix is the transitive closure of the initial one. It can be computed by repeatedly checking every chain of two links until nothing changes, or in one pass with Warshall’s algorithm, as CKR does. Entries that only transitivity produces are written 1* so that a reader can see which links the experts stated and which were inferred.
| Factor | Policy | Management | Finance | Skills | Infrastructure | Security | Adoption | Driving power |
|---|---|---|---|---|---|---|---|---|
| Policy | 1 | 1 | 1 | 1 | 1* | 1 | 1* | 7 |
| Management | 0 | 1 | 1 | 1 | 1 | 1* | 1 | 6 |
| Finance | 0 | 0 | 1 | 0 | 1 | 1* | 1* | 4 |
| Skills | 0 | 0 | 0 | 1 | 1* | 1 | 1 | 4 |
| Infrastructure | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 3 |
| Security | 0 | 0 | 0 | 0 | 1 | 1 | 1 | 3 |
| Adoption | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Dependence | 1 | 2 | 3 | 3 | 6 | 6 | 7 |
Note. 1* marks links added by transitivity. Driving power is the row sum, dependence the column sum.
Six links were added. Policy now reaches Infrastructure (through Finance or Management) and Adoption (through Management or Skills). Skills reaches Infrastructure through Security, because Infrastructure and Security lead to each other. The row sum of the final matrix is a factor’s driving power, the number of factors it reaches including itself; the column sum is its dependence, the number of factors that reach it.
Step 4: how do you partition the levels?
For each factor, write three sets from the final matrix: the reachability set (the factors it reaches, the 1s in its row), the antecedent set (the factors that reach it, the 1s in its column) and their intersection. A factor belongs to the top level when its reachability set equals the intersection: everything it reaches also reaches it, so nothing among the remaining factors sits above it. Remove the top-level factors from every set and repeat.
| Factor | Reachability set | Antecedent set | Intersection | Level |
|---|---|---|---|---|
| 1 Policy | 1, 2, 3, 4, 5, 6, 7 | 1 | 1 | |
| 2 Management | 2, 3, 4, 5, 6, 7 | 1, 2 | 2 | |
| 3 Finance | 3, 5, 6, 7 | 1, 2, 3 | 3 | |
| 4 Skills | 4, 5, 6, 7 | 1, 2, 4 | 4 | |
| 5 Infrastructure | 5, 6, 7 | 1–6 | 5, 6 | |
| 6 Security | 5, 6, 7 | 1–6 | 5, 6 | |
| 7 Adoption | 7 | 1–7 | 7 | I |
Only Adoption has a reachability set equal to the intersection, so it forms level I. Removing it, Infrastructure and Security both have reachability {5, 6} equal to their intersection and form level II together, which is how mutually linked factors always behave. The third iteration places Finance and Skills at level III, the fourth Management at level IV, and the fifth Policy at level V.
- Level IAdoptionThe outcome: reached by every other enabler.
- Level IIInfrastructure ⇄ SecurityMutually dependent; both lead to Adoption.
- Level IIIFinance · SkillsFinance enables Infrastructure; Skills enables Security and Adoption.
- Level IVManagementDrives Finance, Skills, Infrastructure and Adoption.
- Level VPolicyThe root: reaches every other enabler, directly or indirectly.
Note. Arrows point upwards: factors at lower levels lead to those above them. Transitive links are omitted from the digraph, as is usual.
Step 5: how do you do the MICMAC analysis?
MICMAC places each factor by its driving power and dependence. Both axes are split at n/2, here 3.5, giving four quadrants.
- Autonomous (low driving power, low dependence): weakly connected to the system.
- Dependent (low driving power, high dependence): outcomes, driven by the others.
- Linkage (high, high): unstable, because acting on them affects others and feeds back on themselves.
- Independent (high driving power, low dependence): key drivers.
Note. Lines at n/2 = 3.5 divide the chart into autonomous (lower left), dependent (lower right), linkage (upper right) and independent (upper left) factors. Finance and Skills share a position, as do Infrastructure and Security.
Show the data
| Item | Dependence | Driving power |
|---|---|---|
| Policy | 1 | 7 |
| Management | 2 | 6 |
| Finance, Skills | 3 | 4 |
| Infrastructure, Security | 6 | 3 |
| Adoption | 7 | 1 |
| Factor | Driving power | Dependence | Class |
|---|---|---|---|
| Policy | 7 | 1 | Independent |
| Management | 6 | 2 | Independent |
| Finance | 4 | 3 | Independent |
| Skills | 4 | 3 | Independent |
| Infrastructure | 3 | 6 | Dependent |
| Security | 3 | 6 | Dependent |
| Adoption | 1 | 7 | Dependent |
Policy, Management, Finance and Skills are independent: they drive the system and are driven little by it. Infrastructure, Security and Adoption are dependent outcomes. No factor is autonomous, which suggests the list of enablers is well chosen, and none is in the linkage quadrant, which suggests the structure is stable. The finding for practice is that efforts aimed directly at adoption, or at infrastructure alone, will have limited effect unless management commitment and the policy environment are in place.
How does ISM differ from DEMATEL?
Both methods study relations among factors, and they are often used together. ISM works with yes/no links, builds a strict hierarchy of levels and relies on transitivity. DEMATEL works with graded strengths of influence, separates net causes from net effects and adds indirect influence through the matrix series rather than through logical transitivity. ISM is clearer for showing order; DEMATEL for showing strength. A common design uses ISM for the structure and DEMATEL or MICMAC for the strength of each factor’s role.
How do you report ISM and MICMAC?
A complete report includes the list of factors with their sources, the experts and how their codes were combined, the SSIM, the final reachability matrix with transitive entries marked, the level-partition iterations (often in an appendix), the digraph or level diagram, and the MICMAC chart with the threshold used. For the example, the main finding fits in one sentence: “Government policy support formed the base of the hierarchy (level V) with the highest driving power (7), and digital adoption the top (level I) with the highest dependence (7); MICMAC classed policy, management commitment, finance and skills as independent drivers.”
Which mistakes are common in ISM papers?
- Coding the SSIM in the wrong direction. Fix the convention (row leads to column) on the questionnaire and check a few pairs with the experts.
- Forgetting the diagonal 1s, which changes the driving power and dependence of every factor by one and can move factors across the n/2 line.
- Skipping transitivity or not marking 1* entries, so readers cannot tell inferred links from stated ones.
- Drawing transitive links in the digraph, which clutters it; the convention is to show only the links between adjacent levels and within levels.
- Aggregating experts by majority vote without reporting how ties were broken.
In CKR the SSIM is entered as V, A, X and O codes; the initial and final reachability matrices (with 1* marked), every level-partition iteration, driving power, dependence and the MICMAC classes are reported in tables that go straight into the Word report.
Questions people ask
How many factors can ISM handle?
Studies commonly use between 7 and 20. Each expert must code n(n − 1)/2 pairs: 21 for seven factors, 190 for twenty. Beyond that, group the factors first.
How do you combine several experts’ SSIMs?
Most studies use the majority code for each pair. Report the rule and how ties were handled, or discuss disputed pairs with the experts until they agree.
What if two factors end up on the same level?
That is normal and means neither sits above the other. Factors coded X always share a level.
Is the MICMAC threshold always n/2?
Splitting at n/2 is the usual convention; some papers use the mean driving power and dependence instead. State which you used, because factors near the line can change class.
What is total interpretive structural modelling (TISM)?
TISM extends ISM by recording, for each link, the reason the experts gave for it, so the digraph explains each arrow. The matrix steps are the same.
References
Warfield, J. N. (1974). Developing interconnection matrices in structural modeling. IEEE Transactions on Systems, Man, and Cybernetics, SMC-4(1), 81–87. https://doi.org/10.1109/TSMC.1974.5408524
Mandal, A., & Deshmukh, S. G. (1994). Vendor selection using interpretive structural modelling (ISM). International Journal of Operations & Production Management, 14(6), 52–59. https://doi.org/10.1108/01443579410062086
Duperrin, J. C., & Godet, M. (1973). Méthode de hiérarchisation des éléments d’un système. Rapport économique du CEA, R-45-41, Paris.
CKR team · Chakaralaya Analytics
How this was checked. The initial and final reachability matrices, the transitive entries, every level-partition iteration, driving power, dependence and the MICMAC classes were computed with CKR’s ISM. Journal references were checked against Crossref; the Duperrin and Godet report has no DOI.